Deep-tech fintech for banks.

Construction finance · Real-estate collateral · Infrastructure

The physical world does not wait for your next review.

3BrainAI’s Construction Risk Intelligence brings dated satellite observations and project context into traceable evidence for construction finance and collateral review. Specialist analysis and AI are central to our technical approach.

Before the next drawdown, make clear what the evidence supports – and what still needs checking.

01 See the evidenceView an Evidence PackPublic example · 2 pages · No sign-in.
02 Go inside the reviewExplore The Brief10 prepared cases · AT · NL · CZ · DE
Free access by invitation.

Case study · Real historical Copernicus data

  1. Formal review
  2. Evidence Pack
  3. Next review
Explore the review cycle ↓
CRI
The review-support product.
Evidence Pack
The versioned review record.
The Brief
A private walkthrough of prepared situations.

How Construction Risk Intelligence works

Prepare the next review with the evidence in one place.

01 · Observe

Put the project update in context.

Bring authorised project records together with dated observations of the site.

02 · Verify

Know what each source supports.

Examine each source, its date and its relevance to the review question.

03 · Package

Keep the findings together.

Record the findings, their supporting sources and the next review step in an Evidence Pack.

04 · Review

Give the reviewer a clear starting point.

The responsible reviewer examines the evidence and records the next action under the institution’s own rules.

Case Studies

Ten locations. Four countries.

Case studies based on real historical imagery and geodata, with questions for construction and collateral review.

Explore the case studies

Case study · Real historical Copernicus data

The roof is visible.
Is the milestone verified?

See how this public example separates a visible change from the evidence still needed for a construction drawdown review.

Full rendered page 1 of the Fischamend Evidence Pack
Public example · page 1 of 2
Full rendered page 2 of the Fischamend Evidence Pack
Dated evidence and review trail · page 2 of 2
Real historical Copernicus dataDEMO-EU-AT-FIS-01 · v0.3 public source review

Historical evidence review

Fischamend, Lower Austria

Vienna Airport logistics park observation area · Human review required

Question in brief

Did large roofed structures become visible within the observation area between the two dated public optical scenes?

The full pack retains the dated sources, observation limits and next review question.

StatusWATCH – Evidence sufficiency
ConfidenceHigh – large roofed footprint change only

Bank review question

Which structures and project phase should the reviewer relate to these observations? Confirm the relevant asset boundary, milestone definition and dated technical records before assessing progress against a project plan.

The relevant project records must define the asset boundary and milestone before an institution-specific assessment.

Observed – dated public evidence

20 Aug 2023 → 19 Aug 2025

Two large rectangular roofed structures became visible within the selected observation area, replacing predominantly bare or construction-affected surface.

Bounded conclusion

The imagery shows surface-visible change. It does not establish building completion, quality, fit-out, occupancy, environmental compliance, contractual acceptance or payment eligibility. Documentary and engineering evidence remain necessary before any institution-specific conclusion.

Uncertainty and non-inference

Exact project boundary, engineering completion and payment eligibility remain unverified. WATCH refers to evidence sufficiency and the need for documentary review; it is not a negative project rating and does not indicate delay, breach or default.

Provenance

Modified Copernicus Sentinel data 2023 and 2025 · same working retrieval envelope · public source review v0.3.

Human review requiredOpen full Evidence Pack
Mandatory qualifications – read the record boundary

Independent case study based on public project information and dated Copernicus observations. No affiliation with or mandate from the owner, operator, tenants or financing institutions is implied.

No actual project drawdown request, lender decision, contractual milestone, delay, breach, environmental assessment or project-performance assessment is represented.

Full source identifiers, hashes, retrieval envelope and reason codes remain in the two-page Evidence Pack.

Historical · bounded context

Lausitz, Germany

Dated optical observations provide surface-visible context. Engineering completion, water quality and geotechnical condition cannot be determined from imagery.

Open historical prototype

Lausitz optical observation in 2019
2019
Lausitz optical observation in 2026
2026

Historical · bounded context

German North Sea

Repeat-pass SAR provides dated surface-visible context. Bright radar targets do not by themselves confirm individual asset identity, installation or condition.

Open historical prototype

German North Sea Sentinel-1 SAR observation on 7 June 2026
07 Jun 2026
German North Sea Sentinel-1 SAR observation on 19 June 2026
19 Jun 2026

SATELLITE ANALYSIS

See the change. Understand the context.

Repeated satellite measurements, geodata and analytical methods put a location into context.

Time. Coverage. Complementary signals.

Why satellite data matters

Optical observations

t1
t2
t3
t4
t5
t6
Radar · a complementary signal
r1
r2
r3
r4
r5
r6
Illustrative observations, not measured CRI results.

ANOTHER PERSPECTIVE

A new perspective from Munich

A new district takes shape. Connect dated observations to a published milestone and the next review question.

Explore Munich–Neufreimann

3BrainAI · CRI01 / SOURCE CONTEXT Historical orthophoto of the Neufreimann district, acquired on 24 August 2024 Munich–Neufreimann24.08.2024 · DOP20 · Historical orientation
Bayerische Vermessungsverwaltung · CC BY 4.0
District crop, reprojected and resampled for display.

Governed boundary

A governed evidence workflow for accountable institutional review.

Data needs analysis and review before it can support a conclusion.

Controlled ingress

Purpose, identity, permission and traceability remain attached before evidence is packaged.

Versioned Evidence PackHuman review required
01 · Institution approvedProject and portfolio context
02 · Dated evidenceEO and approved external sources
03 · Selected purposeSpecialist inputs with traceability

Target design: institutional roles, evidence and review actions remain separate. Operational deployment is subject to institution-specific validation.

Incubation and technology programmes.

Historical programme

EY Startup Academy Frankfurt 2025

Completed by 3BrainAI Solutions company history

Programme and ecosystem details in About
Portrait of Dusan Prikryl, founder of 3BrainAI

Founder contextDusan Prikryl

Built from both sides of accountability.

Dusan Prikryl founded 3BrainAI after working on both the physical and digital sides of accountability.

His experience spans owner-side responsibility for complex physical assets and later digital products, data operations, analytics and AI.

Historical experience context, not CRI deployments or product outputs.

Read the founder and company context

Measurement before promises

Test the value in a real review.

In an agreed pilot, we will examine how CRI supports bank reviewers: preparing evidence, identifying the next action and explaining how a conclusion was reached.

No result is asserted here.

Institutional authority

Preparation time

Compare the time needed to assemble and review the relevant evidence.

Attached context

Useful follow-up

Assess whether the record helps reviewers identify a clear, appropriate next action.

Bounded publication

Traceability

Check how easily another reviewer can follow a finding back to its sources.

Next bank conversation

Begin with one bounded review question.