
Historical example · Austria
Fischamend
A dated comparison of large roofed footprints. The Evidence Pack keeps observations, the review question and limits together.
Open Evidence Pack v0.5 →For banks, funds and owners.
One property · One earlier assessment One next decision
Our aim: less manual work gathering and comparing evidence, so your team can better prepare the next property review.
Alram14, Munich · Public sources · Prepared review example.
Your existing report can be the starting point. The output is an Evidence Pack with sources, limits and a clear next review step.
The output · Evidence Pack
Sources, findings, limits and the next review step · connected in one versioned document.
Inspect a public Evidence PackFischamend · Historical example of the format, separate from Alram14.
Construction Risk Intelligence (CRI) in 28 seconds
A dated source raises a specific review question. See how the next step and its context can stay together in one record.
Source / Question / Next step
Alram14 · Public-source example · Illustrative workflow. No completed customer review is shown.

Watch without sound · 28 seconds · Sources and limits
Bayerische Vermessungsverwaltung – www.geodaten.bayern.de · CC BY 4.0. Existing geographic crop, resized; image content unchanged.
Illustrative ROI scenario
Assumed outcome, not measured savings or a price quote.
40%less total work per review75 to 45 minutes across all participants.
20%modelled ROI over 12 monthsValue of usable time after model costs.
Based on usable work time, not cash savings.
Assumptions dated October 2026. A pilot would measure actual effort, output quality and costs for the agreed scope.
Total work reduction: (75 − 45) / 75 = 40%. Released time: 50 × (75 − 45) / 60 = 25 h/month. Usable capacity: 25 h × 80% = 20 h/month.
Capacity value: 20 h × €60 × 12 = €14,400. Model costs: (€900 × 12) + €1,200 = €12,000. Net capacity benefit: €14,400 − €12,000 = €2,400. ROI: (€14,400 − €12,000) / €12,000 × 100 = 20%.
Capacity value is not a cash saving. These are model costs, not a price quote. No avoided loss is included.
With the same monthly assumptions: €7,200 capacity value − €6,600 model costs = €600 net capacity benefit. ROI: (€7,200 − €6,600) / €6,600 × 100 ≈ 9.09%. The one-off setup cost is spread over a shorter period.
First paid engagement
An earlier report, the property and the question your team needs to answer. A general description is enough for first contact.
Suitable dated sources, the review scope and the specialist involvement needed for your question.
An Evidence Pack with sources, observations, limits and a documented next step. If the question cannot be answered, it records the missing evidence or inspection needed.
Your team provides the context and a responsible reviewer; any data access or IT involvement is agreed for the engagement. Scope, required sources, specialist involvement, price and delivery date are agreed before work begins.
The public Evidence Pack and The Brief present prepared examples. The CRI demonstrator is in development. The functions available in a demonstration and the scope of any paid engagement are agreed separately. Specialist review remains part of the process.
The Brief
Seven model situations from property finance.
See what to check before the next decision.
Explore the review question, the evidence to examine and the next step for the bank.
Illustrative scenarios, not customer results.


CRI was selected for ESA BIC Czech Republic in 2026.
Company history: 3BrainAI Solutions completed EY Startup Academy Frankfurt 2025.
Programme and ecosystem details in About →Further perspectives

Historical example · Austria
A dated comparison of large roofed footprints. The Evidence Pack keeps observations, the review question and limits together.
Open Evidence Pack v0.5 →
What do the sources show about the new district?
Bayerische Vermessungsverwaltung · Geodaten Bayern · CC BY 4.0
Land & water · Sentinel-2


From open-pit mine to lake: what visibly changed?
Explore the comparisonOffshore wind area · Sentinel-1 radar


Two radar observations: what is visible at the sea surface?
Explore the comparisonHistorical observation pairs · Contains modified Copernicus Sentinel data (2019, 2026).
Village im Dritten: Datenquelle: basemap.at; © OpenStreetMap contributors · ODbL 1.0. Smíchov City: © ČÚZK / Zeměměřický úřad, Praha 7-2, 2025. CTP Amsterdam: Beeldmateriaal Nederland / PDOK, 2025. CC BY 4.0. Montage of three locations; crops, fades and display colour adjustment. Vienna: acquisition date unverified. Prague and Amsterdam: 2025 product references; exact acquisition days unverified.
Satellite analysis
See how source selection, analysis and validation support a scoped human review.
Explore the analytical principleSchematic illustration · not measured CRI results.
Elmar WEB · Prepared guide
Prepared answers with sources. No live analysis or document upload.
The dated images provide historical context. Public project announcements describe the restart. The review question is which schedule and milestone apply; the image alone cannot answer it.
No. Their scope, milestone definition and current validity need checking. The agreed project schedule is not available in this public example, so no delay or completion percentage can be established.
No. This prepared guide explains public material. It does not inspect private project records, issue an assessment or make a lending decision. A responsible specialist must review the case.
Start with one property and one review question. Our team will discuss the relevant records, scope, price and delivery date. A general description is enough for the first contact.
Elmar does not infer missing project facts. Ask our team if the sources do not answer your question.
Discuss one property →